When people imagine a construction site, they often see the visible: cranes lifting steel, workers in vests, machines pushing dirt. But long before any of that happens—and long after crews leave for the day—there’s a quiet force keeping it all together: preconstruction and logistics.
At Clayco, we often say that the real magic of a successful project happens before the first concrete pour. Preconstruction is where the vision becomes reality, and where problems are solved before they ever exist.
What does preconstruction actually include?
Everything that makes a job site run right.
Our teams craft full project execution plans, develop 4D schedules, and run virtual design and construction (VDC) simulations to identify bottlenecks before they form. We manage scope and cost models, review design documents for constructibility, and coordinate complex building systems through our Technical Assurance Group (TAG).
It’s detailed. It’s technical. And it’s essential.
We also plan for:
This is where relationships are built with subcontractors, community partners, and clients. It’s where momentum is created.
Once construction begins, logistics takes the baton.
Deliveries arrive not by chance, but by carefully coordinated schedules. Walkways, roadways, parking zones, hydration stations, and signage aren’t afterthoughts—they’re predesigned to move people and materials safely and efficiently.
Every job site has an internal rhythm: where cranes swing, where workers flow, where materials stage. That choreography is only possible when logistics leads.
Preconstruction and logistics don’t make the final photo.
They don’t cut ribbons or pour concrete.
But without them, nothing happens on time, on budget, or on spec.
They are the anatomy of the job site: the skeletal system, the nervous system, the circulatory system. Everything else just fills in around them.
So here’s to the planners, schedulers, modelers, coordinators, and logistics pros. Your work may be behind the scenes, but it’s what makes every scene possible.